Saturday, November 25, 2006

Passageway


floors done

repainted

new wood flooring in the passageway to the kitchen which replaced the marble tiles

from the passage outside bedroom 2 looking to the entrance hall and the now closed up entrance to the living room (left) and down the passageway after repainting (right).

preparing the wood doors and frames for painting (left) the inside of the front door now painted (right)

Before, showing the carrara marble tiles that were later replaced with wood

Posted by Russell at 00:00:00
Comments

Comments are closed.